Saturday, September 6, 2008

Lately

Nick and I have both started our new jobs. We both really enjoy the work we are doing and the people we work with. The house is really coming along. Right now they are putting the drywall up inside.

Friday, August 22, 2008

Brick, Windows and a Roof

We now have brick, windows and a roof. They will begin placing the stone on the front tomorrow. The heating/cooling and electrical has been completed on the inside as well.


Wednesday, August 13, 2008

Yet another house update

They are working on the roof this week. Hopefully the shingles will go on Thursday or Friday. The electrician comes Friday to install all the electrical.

Thursday, August 7, 2008

It's starting to look like a house!

They are still working on framing the upstairs, but the framing is really coming along. They will finish the framing early next week and then move on to the roof. Nick and I will be in Nashville for Lindsey's wedding all next week and then on vacation the next, but hopefully our builder will send us pictures as it progresses over the next couple of weeks. This picture shows the back of the house.

Tuesday, August 5, 2008

8-5-08


We have a floor! Framing begins tomorrow.

Saturday, August 2, 2008

House update

We have a foundation! This picture was taken from the back/side yard.
The garage was poured yesterday, and the framing will begin sometime next week.

Tuesday, July 15, 2008

Ahead of Schedule

They dug the footings for our foundation today!! We really weren't expecting them to break ground for another week and a half, so we were so pleased to see such fast progress.
I will post pictures every few days of the progress they are making. Everything will go up really fast over the next 4 weeks, and then things will slow down as they move to the interior.

Sunday, July 13, 2008

Interior Selections

We picked out all our interior selections for the house last week. This post probably goes into too much detail, but for those who are interested I have posted pictures from our day at the design center. This picture shows all our interior paint colors (the three colors at the bottom of each strip). The almond color is the trim color, the green is the color that will be in the dining room, laundry room, powder room, and bonus room upstairs. The latte/tan color is our main house color. The picture below shows our kitchen cabinets, kitchen counter, kitchen cabinets knob and pull, and our flooring downstairs. The knobs go on the cabinet doors and the pulls are going on the drawers.







These pictures show our master bathroom tile for the floor and shower, counters, cabinets and cabinet knob and pulls.















These pictures show our upstairs guest bathroom cabinets, tile floor, counter, paint color and cabinet knob.
This is our laundry room floor tile and paint color.
This picture shows our fireplace tile. The mantle will be wood and will be stained to match our floors (the English Chestnut stain shown below). Construction will start in 2 weeks, so I will post pictures once they break ground. Once they break ground it will take 4 weeks to get to the dry wall stage, so it will go up pretty fast initially.

Tuesday, June 3, 2008

We love, love, love our new city!

We are all settled in Chattanooga, and we are doing a little exploring and a lot of studying. We have Bar review classes every night, and we study most of the day, but as you can see we have managed to carve out a little time to have fun. The area you are looking at in the picture below is Northshore (which is where we live). The Northshore area is full of restaurants, shops, condos, etc. and is a two minute walk across the pedestrian bridge to downtown. Our apartment is located up in those hills that you see in the photo. The bridge in the photo is the pedestrian bridge, which is the longest in the world. Nick and I enjoy exercising on that bridge because there is usually a great breeze and beautiful views of downtown, the River, Signal Mountain and Lookout Mountain. One of our new favorite activities is hiking. In the next two pictures we are hiking on Signal Mountain. Notice the rhododendron (the purple flowers) in the background of the first picture. Those only bloom in nature once a year and only last for about three weeks. We have had the opportunity to see them twice now.
The picture below was taken on Signal Mountain, and the view is of Raccoon Mountain and the Narrows of the Tennessee River. Last weekend Ashley came to visit! Because of our busy study schedule, she could only come for one day, but we were thrilled to have her. This picture was taken on top of Lookout Mountain.

Overall, we absolutely love it here, but please keep us in your prayers as we study, meet new friends, and look for a church home.

Friday, May 9, 2008

We graduated!




I didn't have many pictures on my camera, but I thought I'd post the ones I had. We had a wonderful day celebrating!