Tuesday, July 15, 2008

Ahead of Schedule

They dug the footings for our foundation today!! We really weren't expecting them to break ground for another week and a half, so we were so pleased to see such fast progress.
I will post pictures every few days of the progress they are making. Everything will go up really fast over the next 4 weeks, and then things will slow down as they move to the interior.

Sunday, July 13, 2008

Interior Selections

We picked out all our interior selections for the house last week. This post probably goes into too much detail, but for those who are interested I have posted pictures from our day at the design center. This picture shows all our interior paint colors (the three colors at the bottom of each strip). The almond color is the trim color, the green is the color that will be in the dining room, laundry room, powder room, and bonus room upstairs. The latte/tan color is our main house color. The picture below shows our kitchen cabinets, kitchen counter, kitchen cabinets knob and pull, and our flooring downstairs. The knobs go on the cabinet doors and the pulls are going on the drawers.







These pictures show our master bathroom tile for the floor and shower, counters, cabinets and cabinet knob and pulls.















These pictures show our upstairs guest bathroom cabinets, tile floor, counter, paint color and cabinet knob.
This is our laundry room floor tile and paint color.
This picture shows our fireplace tile. The mantle will be wood and will be stained to match our floors (the English Chestnut stain shown below). Construction will start in 2 weeks, so I will post pictures once they break ground. Once they break ground it will take 4 weeks to get to the dry wall stage, so it will go up pretty fast initially.